FireDot.com

Table Of Contents

Subject Revision Date

General Information

- -

1-1 Introduction

1 04-01-2002
Components - -
2-1 Cylinders & Valves 1 04-01-2002
      Valve Rebuilding Equipment - -
      Wet Valve Seal Rebuilding Kit - -
2-2 Pressure Regulatory Assembly - -
      Pressure Regulator Rebuilding Kit - -
      Model VT-1 Tool - -
      Cylinder Bracketing - -
      Extinguishing Agent - -
2-3 MCH3 Control Head - -
      ECH3 Control Head - -
      NMCH3 Control Head - -
      EN-MCU3 Enclosure - -
      EN-S Enclosure - -
2-4 MB-P2 Mounting Bracket - -
      Pneumatic Actuating Cylinder - -
      PAC - 10 - -
2-5 Detection Equipment 1 04-01-2002
      FLK - 1 - -
      FLH - 1 - -
2-6 Fusible Links 1 04-01-2002
      Thermal Detectors - -
      RPS-M Remote Pull Station - -
      Gas Shut Off Valves - -
      GV Shut Off Valves - -
2-7 EGVSO Gas Shut Off Valves 1 04-01-2002
      Corner Pulleys - -
      SBP-1 Corner Pulleys - -
      CBP-1 Corner Pulleys - -
      WBP-1 Corner Pulleys - -
2-8 Tee Pulley 1 04-01-2002
      Electric Switches - -
2-9 SM-120/24 Solenoid Monitor - -
      Pipe and Fittings - -
      Nozzles - -
      Swivel Adaptor - -
2-10 Components List 1 04-01-2002

System Design

- -
3-1 Nozzle Coverage and Placement 1 04-01-2002
      Duct Protection - -
      Transition Ducts - -
3-2 Electrostatic Precipitator 1 04-01-2002
       Plenum Protection - -
3-3 Appliance Protection 1 04-01-2002
      Design Chart - -
      Fryers - -
3-4 Range (Small) 1 04-01-2002
3-5 Range (Large) 1 04-01-2002
3-6 Small Work 1 04-01-2002
3-7 Large Work - -
      Small Griddle 1 04-01-2002
3-8 Large Griddle - -
       Radient Char Broiler 1 04-01-2002
3-9 Radient Char Broiler 1 04-01-2002
      Lava Rock Char-Broiler - -
      Natural Charcoal Char-Broiler - -
3-10 Mesquite Char-Broiler 1 04-01-2002
        Upright/Salamander Broiler - -
3-11 Chain Broiler 1 04-01-2002
       Tilt Skillet/Braising Pan - -
3-12 Fryer - Multiple Nozzle Protection 1 04-01-2002
       Piping Limitations - -
3-13 General Piping Requirements 1 04-01-2002
        Design Steps - -
3-14 Design Steps (cont.) 1 04-01-2002
3-15 Design Steps (cont.) 1 04-01-2002
3-16 Design Steps (cont.) 1 04-01-2002
3-17 Detector Placement New 04-01-2002
        Exhaust Duct(s) - -
        Cooking Appliance(s) - -
3-18 Notes New 04-01-2002

System Installation

- -
4-1 General 1 04-01-2002
       Cylinder Installation - -
       Control Head Installation - -
       Single Cylinder Introduction - -
4-2 Multiple Cylinder Installation 1 04-01-2002
4-3 Multiple Cylinder Installation (cont.) 1 04-01-2002
4-4 Fusible Link Detector Installation 1 04-01-2002
      Fusible Links Without Hangers - -
4-5 Fusible Links With Link Hangers 1 04-01-2002
4-6 Thermal Detector Installation 1 04-01-2002
       Setting The Control Head - -
       MCH3/NMCH3 Control Head - -
       ECH3 Control Head - -
4-7 Solenoid Monitor Installation In A Detection Circuit 1 04-01-2002
4-8 Solenoid Monitor When Used As A Reset Relay 1 04-01-2002
      Remote Pull Station Installation - -
4-9 Remote Pull Station Installation (cont.) 1 04-01-2002
4-10 Gas Shut Off Valve Installation 1 04-01-2002
         Mechanical Gas Shut Off Valve Installation - -
         Electrical Gas Shut Off Valve Installation - -
4-11 Tee Pulley Installation      1 04-01-2002
        Miniature Switch Installation - -
4-12 Pipe And Nozzle Installation 1 04-01-2002
        System Checkout after Installation - -
        Model MCH3/NMCH3 - -
        Mechanical Control Head - -
4-13 Model ECH3-24/120 - -
        Electrical Control Head - -
4-14 Enclosure Mounting 1 04-01-2002
        Fusible Link Detector Installation - -
4-15 Setting the EN-MCU3 Remote Pull Station Installation  1 04-01-02
4-16 Gas Shut-Off Valve Installation 1 04-01-2002
4-17 Miniature Switch Installation - -
4-18 Cylinder Installation 1 04-01-2002
         Single Cylinder Installation - -
         Multiple Cylinder Installation - -
4-19 System Checkout After Installation - -
4-20 Notes - -

System Maintenance

- -
5-1 General 1 04-01-2002
       Semi-Annual Maintenance - -
       Annual Maintenance - -
       12-Year Maintenance - -
5-2 Notes - -

System Recharge

- -
6-1 General 1 04-01-2002
       System Cleanup - -
       System Recharge - -
6-2 System Recharge (cont.) 1 04-01-2002
 
                                                             Copyright © Gallagher Fire
All rights reserved
Last modified: October, 2010